Low Energy Adaptation Project (LEAP)

Building to PassivHaus standards

NIHE appointed CFM as the main contractor of a Pilot scheme to construct it's first ever Low
Energy Adaptation Project (LEAP). Construction involved the off-site prefabrication of a
modular building, whilst the construction on site was to PassivHaus standards, including
installation of Mechanical Ventilation Heat Recovery System


(MVHR).

NIHE are looking at ways of developing sustainable construction methods with a view to
introducing them on future procurements. This project compares traditional construction to
that of German PassivHaus standards and will be used as a benchmark against this fabric first
approach.

image

PROJECT DETAIL

  • Date: June 2015
  • Client: NIHE
  • Location: Belfast